Here's what you will get when you upgrade your air conditioning and gas furnace complete with Prime AC and Heat.
Amana Bronze Level
-
High-Efficiency Compressor
-
High-Efficiency Furnace
-
Total Installation Including Labor, Materials & Miscellaneous items to complete the installation
-
Removal and Proper Disposal of old air conditioning and heating equipment
-
Proper disposal of old refrigerant
-
Level hang furnace or install in a vertical closet.
-
New metal insulated supply and return plenums
-
4" Media filter installation
-
Drain pan and safety drain switch installation
-
Hard pipe code gas line and flex line installation
-
Duct collar code seal
-
Level Ground and Install New Condenser Pad
-
Remove and install new disconnect and electrical whip.
-
Re-insulating copper pipe outside with UV rated code armorflex
-
Low voltage conduit protection
-
Honeywell Thermostat
-
Pressure test and Vacuum test to Insure no leaks
-
Startup and 410-a refrigerant charging
-
City Permits and warranty registration
-
10 year part warranty
-
1-year labor warranty
-
*Financing On Approved Credit Terms and Conditions Apply.
-
Payments Shown On *Option#2 reflecting financing plan of 3.99% for 144 months.
-
Payments for 0% for 60 Months are not shown. (Please call for more information)
OPTION #1
Instant Discount Cash Rebate
2-Ton=$6,295
3-Ton=$6,674
4-Ton=$7,266
5-Ton=$7,844
OPTION #2
*No Money Down Low 3.99% or 60 Months 0% Special Financing
2-Ton= $65.27/Mth
3-Ton= $69.20/Mth
4-Ton= $75.34/Mth
5-Ton= $81.33/Mth


.png)

